Continuous-process facilities where supply continuity, arc-flash containment and the separation of hazardous and non-hazardous areas drive every equipment decision.

What Electrical Equipment for Oil, Gas and Petrochemical Facilities Needs

Facilities handling oil, gas or petrochemical feed have two independent constraints that must be satisfied together. The first is area classification: equipment installed in a classified zone has to be certified for that zone and that gas group. The second is process continuity: a distribution fault in a continuous plant is not an inconvenience, it is an unplanned shutdown.

These two requirements pull the design in different directions. Zone classification is resolved at the equipment-selection stage and is fixed by the area drawing, while continuity is resolved by topology — ring main units rather than radial feeders, redundant transformers, and interlocking that keeps the alternative supply available.

Because certification documents are only valid for a specific product and a specific zone classification, the certificate scope has to be checked against the requirement before anything is ordered. We make that check part of the quotation rather than something the contractor discovers later.

Typical Equipment Package

EquipmentRole in this application
KYN28A-12 MV switchgearMetal-clad 12kV with arc-resistant construction options and the interlocking scheme required for a redundant supply
HXGN-12 ring main unitCompact RMU for ringed distribution where loss of a single feeder must not interrupt the load
S13 / S20 / S22 oil-immersed transformerOn-site units with the oil containment and fire separation arrangement required by the site
YB12 package substationPrefabricated outdoor unit for auxiliary and remote load points

Equipment combinations shown are typical configurations for this type of installation. The delivered configuration is confirmed in the technical agreement against your single-line diagram and site conditions.

Design Considerations

Area classification

The equipment certificate must cover the zone classification, the gas group and the temperature class of the installed location. We verify the scope against the requirement before the order is confirmed.

Arc-flash containment

For a switchgear installed in an accessible area, incident energy has to be assessed against the incident energy analysis, and the enclosure class, the panel type and the personnel protection arrangement are selected to match.

Supply topology

Ring main units rather than radial feeders, two-transformer arrangements with a coupling point, and automatic transfer at the incomer — the topology is decided together with the process, not after it.

Interlocking and protection

Interlocks between the incomer and the coupler, and the protection settings, are confirmed in the technical agreement because they determine how the system behaves during a fault and during a maintenance window.

Documentation for the safety case

Test reports, the approved drawing and the certification scope are the documents an audit asks for, so they are supplied as part of the delivery package.

Frequently Asked Questions

Can you supply explosion-proof certified enclosures?

We supply enclosures built for classified-area installations, and we verify that the certificate scope matches the zone, gas group and temperature class of the installed location. Send the area classification drawing with your enquiry and we will confirm what we can cover.

How do you handle arc-flash requirements?

We work from your incident energy analysis. The enclosure type, the panel type and the maintenance access arrangement are selected to fall within the calculated limits, and the arc-resistant construction is quoted as an option on the switchgear.

What is the advantage of an RMU over a conventional switchboard in a plant network?

A ring main unit keeps the load supplied when one feeder is out of service, which is the normal way a plant maintains supply during maintenance or a single fault. That redundancy is the reason the topology is specified at the beginning.

Do you supply spare parts with the package?

On request. A recommended spare parts list is prepared with the quotation, sized to the installed base and the maintenance regime you intend to run.

Equipment for Oil, Gas and Petrochemical

Send the single-line diagram or the equipment schedule, the destination country and the quantity. We reply with a configuration proposal and a price, normally within 24 hours.

Request a Quotation

Related Products

Chat on WhatsApp
Email us Request a Quote