Liupanshui, Guizhou, China — High-voltage switchgear
Core team members participated in the distribution works of a hydropower station, responsible for switchgear installation, commissioning and energisation support.
The site combined a high humidity level with a load profile that varied with the river flow. The core team participated in the installation and commissioning of the high-voltage switchgear, and in the energisation support for the station distribution system.
| Item | Detail |
|---|---|
| Location | Liupanshui, Guizhou, China |
| Sector | Hydropower |
| Equipment scope | High-voltage switchgear |
| Team role | Installation, commissioning and handover support |
| Highlight | Installation in a humid environment with a fluctuating load profile. |
Project references describe work in which our core team participated. They are included as capability references — showing that the team has worked in this type of environment and is familiar with this sequence — and are not presented as company contract record.
Tell us the sector, the location and the equipment scope, and we will tell you what configuration we would propose and what the lead time looks like for it.
Request a Quotation+86 186 5877 2666
Official page coming soon
sw@xsdq.cc
+86 186 5877 2666